工厂实力

Five operating pillars wholesale buyers evaluate before RFQ: workshop, equipment, QC, packing & loading, and export experience.

01 / Workshop

Production workshop

Ceramic forming, glazing, and vanity assembly floors sized for wholesale volume—not showroom-only samples.

  • Ceramic toilet lines for smart, one-piece, and wall-hung programs
  • Vanity assembly bays for wall-hung, freestanding, compact, and pedestal SKUs
  • SKU shortlists that can repeat across multi-family and hotel phases
  • Sample lock areas kept separate from mass-production lanes
Browse toilet & vanity programs
Ceramic toilet production workshop
Ceramic toilet production workshop floor
Vanity assembly workshop

02 / Equipment

Processing equipment

Core equipment supporting toilet ceramics and vanity programs. Tooling and mold capacity are scoped during OEM / ODM reviews.

Kiln & ceramic line
Forming, glazing, and firing capacity for wholesale toilet programs
CNC / cutting
Vanity panel and component processing for width matrices
Assembly stations
Hardware, basin, and finish assembly with sample-lock references
Molds & tooling
Discussed per OEM brief—lead time confirmed on quotation
Inspection tools
Dimension and finish checks tied to approved samples
Packing lines
Export carton stations adjacent to finished-goods staging

Prototype equipment list for buyer evaluation. Replace with factory-approved names and capacities before launch.

OEM / ODM equipment scoping
Factory processing equipment
Ceramic forming equipment detail
Factory floor equipment view

03 / Quality control

QC checkpoints

Incoming, in-process, and pre-shipment checks tied to the approved sample—so mass production does not drift from what you signed off.

  1. Incoming — Materials and components checked against the RFQ / sample standard
  2. In-process — Dimensions, glaze/finish, and assembly checkpoints on the line
  3. Pre-shipment — Visual, packing marks, and carton integrity before booking
  4. Release — Loading list and photos available with the shipment pack
View certificate gallery
Quality inspection area
Factory QC operations
Compliance and QC documentation desk

04 / Packing & loading

Packing & container loading

Export cartons, carton marks, and mixed-container plans for toilets and vanities—written into the quotation, not left to packing week.

  • Export carton method and estimated units per carton
  • Carton marks / barcode fields for warehouse receiving
  • 20GP / 40HQ mixed-load planning for toilets + vanities
  • Loading photos and packing lists with the shipment pack
  • OEM private-label packing after artwork freeze

Documents buyers typically request

  • Packing list aligned to quotation SKUs
  • Carton dimension notes for logistics
  • Loading photos for the booked container
Ask for packing on your quote
Export warehouse and container loading=
Packing station
Shipping preparation

05 / Export experience

Export experience

North America–focused wholesale channel, with additional project deliveries supporting Europe, Middle East, and Asia programs.

  • Primary market: North America distributors, importers, and project buyers
  • Also supported: Europe, Middle East, and Asia project deliveries
  • Quote fields: MOQ, lead time, packing, Incoterms on one written quote
  • Compliance path: Certificates mapped to destination after RFQ scope
  • Project link: Phased containers for hotel and multi-family programs
North America Europe Middle East Asia
See overseas & project cases
Finished goods warehouse for export
Finished goods storage
Global export project reference

Factory & export

Ready for a factory-direct quote?

Share SKUs, destination, volume band, and whether you need packing photos or OEM marks. We reply with MOQ, lead time, packing, and Incoterms.