{"id":185,"date":"2026-08-09T20:57:05","date_gmt":"2026-08-09T20:57:05","guid":{"rendered":"https:\/\/xinlingwood.com\/cases\/multi-phase\/"},"modified":"2026-08-09T20:57:05","modified_gmt":"2026-08-09T20:57:05","slug":"multi-phase","status":"publish","type":"mz_case","link":"https:\/\/xinlingwood.com\/zh\/cases\/multi-phase\/","title":{"rendered":"Phased apartment unit specs"},"content":{"rendered":"<h2>Challenge<\/h2>\n<ul>\n<li>Later buildings often invent new vanity widths if phase one never froze a matrix.<\/li>\n<li>Wall-hung toilets needed carrier coordination and dimension drawings early.<\/li>\n<\/ul>\n<h2>Solution<\/h2>\n<ul>\n<li>Mapped BJ-WH-450 and MY-8844 to primary unit bathrooms.<\/li>\n<li>Collected carrier notes and CAD on the RFQ before sample lock.<\/li>\n<li>Documented the shortlist so phase-two buildings could reorder the same pair.<\/li>\n<\/ul>\n<h2>Results<\/h2>\n<ul>\n<li>Unit plans stayed visually consistent across buildings.<\/li>\n<li>Install teams reused the same dimension package.<\/li>\n<li>Mixed-container planning stayed tied to one SKU shortlist.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Wall-hung toilets and floating vanities mapped to unit plans so later buildings keep the same SKUs.<\/p>","protected":false},"featured_media":0,"template":"","mz_case_cat":[33],"class_list":["post-185","mz_case","type-mz_case","status-publish","hentry","mz_case_cat-multi-family"],"_links":{"self":[{"href":"https:\/\/xinlingwood.com\/zh\/wp-json\/wp\/v2\/mz_case\/185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/xinlingwood.com\/zh\/wp-json\/wp\/v2\/mz_case"}],"about":[{"href":"https:\/\/xinlingwood.com\/zh\/wp-json\/wp\/v2\/types\/mz_case"}],"wp:attachment":[{"href":"https:\/\/xinlingwood.com\/zh\/wp-json\/wp\/v2\/media?parent=185"}],"wp:term":[{"taxonomy":"mz_case_cat","embeddable":true,"href":"https:\/\/xinlingwood.com\/zh\/wp-json\/wp\/v2\/mz_case_cat?post=185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}