合规性 1 分钟阅读

可用的卫浴 OEM 工厂审核应该是什么样

Skip tourism factory tours. Audit process control, QC gates, packing, and how deviations are documented.

Key takeaways

  • Walk the process, not only the showroom: casting, glaze, firing, assembly, packing.
  • Ask who stops the line when a defect family appears, and how that is recorded.
  • Photograph packing stations and compare them to the carton you approved on sample.

A useful bathroom OEM audit is short on hospitality and long on evidence. You want to see how glaze lots are traced, how kiln schedules are logged, and how vanity hardware kits are kitted against a BOM.

Bring your own checklist: incoming material checks, in-process inspection, final AQL practice, and container loading photos from the last three shipments to similar markets. Certificates on the wall matter less than whether those practices appear on the floor.

Close with a written punch list and owners. Audits that end in “looks good” rarely improve the next container.

需要匹配的批发方案?

请发送产品意向、目标市场、预计数量与包装需求,我们将为您规划报价路径。

索取目录与报价